Parts enter the booth through the conveyor openings, then pass the coating operator stations to receive the coating. The powder overspray is entrained within the air stream moving to the collector module, where the cartridge filters will remove the particulate.  The containment air is drawn through the air handler’s primary and final filter system before being discharged back into the room. Coated parts exit the booth for conveyance to the cure oven.

 

CONSTRUCTION

Cabin panels are fabricated from 18-gauge prime quality galvanized steel, flanged and precision punched on 6" centers for maximum rigidity.  Panels are fastened together with 5/16" bolts/nuts and are to be sealed with the provided caulk following assembly. The base frame and floor support are fabricated with 4" channel and 10 gauge mild steel. Base will ship assembled, and cabin will ship knocked-down for field assembly. #304 stainless steel panels are available as an upgrade.

 

CONTROL EQUIPMENT

• NEMA 12 Remote Electrical Panel

• Primary Disconnect

• Automatic Purge/Pulse Control

• Main Air Line Disconnect

• Magnahelic Pressure Gauge

 

Unit of Measure
Items
EZ Pass-Thru, Lexan Top

EZ Pass Thru Powder Booth, Conveyorized

EZ Pass-Thru, Lexan Top

EZ Pass Thru Powder Booth, Conveyorized

EZ Pass-Thru, Lexan Top

EZ Pass Thru Powder Booth, Conveyorized
Interior Width N/A 5'-0" N/A 6'-0" N/A 7'-0"
Interior Height N/A 8'-0"
Interior Length N/A 14'-0"
Part Opening Width N/A 3'-0" N/A 4'-0" N/A 5'-0"
Part Opening Height N/A 6'-0"
Operator Access (Auto) N/A 2
Operator Access (Manual) N/A 2
Total CFM N/A 7,000 at 4.5" SP N/A 8,000 at 4.5" SP N/A 9,000 at 4.5" SP
Manufacturer N/A COL-MET

Certifications